Rhodes Engineering Research Center constructionClemson University LibrariesTaken from Cooper Library. Riggs Hall in background. On back: [Rhodes Engineering Research Center construction]; [September 3, 1968] 9/3/68
Calhoun Courts under constructionClemson University LibrariesPhoto of Calhoun Courts apartment house build site, with view of entrance to Calhoun Courts Commons in the background.
Paul Toby, Sarah Beaudrot, and Henry Vogel at Hunter construction siteClemson University LibrariesOn back: [Mr. and Mrs. Paul L. Tobey (Sarah Beaudrot) donors of Tobey-Beaudrot Professorship in Chemistry with drawing of Hunter Chemistry Laboratory c1987]; 2. Mr. and Mrs. Paul Tobey
Paul Toby, Sarah Beaudrot, and Henry Vogel at Hunter construction siteClemson University LibrariesOn back: [Hunter Chemistry Laboratory construction, c1986] [Paul L. Tobey and Sarah Beaudrot (Mrs. Paul Tobey) donors of Tobey-Beaudrot Professorship in Chemistry]; Tobey-Beaudrot Professorship Paul Tobey (alumnus) CHEMISTRY 1985.