Johnstone Hall New F constructionClemson University LibrariesOn back: [Johnstone Hall construction] [c1954]; dormitory new additon - summer 1960 construction
Lehotsky Hall groundbreakingClemson University LibrariesUA100_001485; On Back: [Jervey Athletic Center groundbreaking] [c1973] (foreground left to right): Dean of the College of Forest and Recreation Resources, William Henry Davis McGregor; Robin Hardin (student representative of the Recreation and Parks Department), President Edwards, and Chairman of the South Carolina Forestry Study Commission, R. Scott Wallinger  Note rendering on easel, which matches image no. 624.
Lever Hall under constructionClemson University LibrariesUA100_2124; On Back: [High Rise Dormitories Construction] [1967]; High Rise Dorms; Steel Girder Construction
Manning Hall under constructionClemson University LibrariesUA100_2123; On Back: [High Rise Dormitories Construction]; Progress Report; New High Rise Dorm; Oct. 1966
Mauldin Hall, under constructionClemson University LibrariesNortheast-facing exterior shot of Mauldin Hall during construction. On back: [Low Rise dormitories]; Mauldin Hall;[Construction]; Dorm - Girls - Ext.
Mauldin Hall, under constructionClemson University LibrariesNorthwest-facing exterior shot of Mauldin Hall during construction. On back: [1963];[Low Rise dormitories]; Construction Mauldin Hall; Dorm - Girls - Ext.
Paul Toby, Sarah Beaudrot, and Henry Vogel at Hunter construction siteClemson University LibrariesOn back: [Mr. and Mrs. Paul L. Tobey (Sarah Beaudrot) donors of Tobey-Beaudrot Professorship in Chemistry with drawing of Hunter Chemistry Laboratory c1987]; 2. Mr. and Mrs. Paul Tobey
Paul Toby, Sarah Beaudrot, and Henry Vogel at Hunter construction siteClemson University LibrariesOn back: [Hunter Chemistry Laboratory construction, c1986] [Paul L. Tobey and Sarah Beaudrot (Mrs. Paul Tobey) donors of Tobey-Beaudrot Professorship in Chemistry]; Tobey-Beaudrot Professorship Paul Tobey (alumnus) CHEMISTRY 1985.
R. M. Cooper Library constructionClemson University LibrariesUA100_001771; On Back: [R.M. Cooper Library construction]; Construction on the new library, move ahead at a fast pace
R. M. Cooper Library constructionClemson University LibrariesUA100_001776; On Back: [R.M. Cooper Library construction] [c1965]; Clemson changes its complexion - a new library.
R. M. Cooper Library constructionClemson University LibrariesUA100_001788; On Back: [R.M. Cooper Library construction] [c1966]; Clemson's new library, once a dream - now reality
R. M. Cooper Library constructionClemson University LibrariesUA100_001774; On Back: [R.M. Cooper Library construction] [c1965]; Seniors will this ever develop into a 1.5 million dollar library?
R. M. Cooper Library constructionClemson University LibrariesOn back: [R.M. Cooper Library construction]; LIBRARY PROGRESS - JAN.1965
R. M. Cooper Library constructionClemson University LibrariesUA100_001779; On Back: [R.M. Cooper Library construction] [c1965]; The new library shows progress for Clemson Anniversity
R. M. Cooper Library constructionClemson University LibrariesUA100_001773; On Back: [R.M. Cooper Library construction]; [c1965]; The Building Construction boys have a chance to learn from practical experience
R. M. Cooper Library constructionClemson University LibrariesUA100_001777; On Back: [R.M. Cooper Library construction] [c1965]; New Library Construction 1965
R. M. Cooper Library constructionClemson University LibrariesUA100_001781; On Back: [R.M. Cooper Library construction] [c1965]; ALUMNI NEWS ANNUAL REPORT FRONT COVER